How to Submit a Tech Pack to Your Clothing Factory: Step-by-Step Process
Submitting a tech pack incorrectly causes confusion and delays. Here is the exact process for sending your documentation to a clothing factory for clean sample starts.
Submitting a tech pack to a clothing factory is not just attaching a PDF to an email. The way you present and communicate your documentation affects how quickly the factory starts, how accurately they interpret your spec, and how efficiently the revision process runs. Here is the step-by-step process for a clean tech pack submission.
STEP 1: COMPLETE A FINAL DOCUMENTATION CHECK
Before sending, verify your tech pack is complete using a checklist. The elements factories most commonly find missing are: tolerance values in the measurement table, Pantone references for all colors, placement measurements for labels and prints, and stitch specifications for non-standard construction. Fix these before submitting — sending an incomplete tech pack and then sending corrections creates confusion about which version the factory should use.
STEP 2: ORGANIZE YOUR FILES
Send your tech pack as a single, well-organized PDF if possible. If you have supporting files — artwork files for print or embroidery, physical swatch photos — organize them in a clearly labeled folder. Name all files consistently with your style number and revision number. Example: STYLE-001_REV01_TechPack.pdf, STYLE-001_REV01_ChestPrint_Artwork.ai
Avoid sending multiple separate documents via email that the factory has to assemble. A single organized PDF with embedded or appended artwork references is easier to distribute within the factory.
STEP 3: WRITE A CLEAR COVERING EMAIL
Your submission email should include:
• Style name and style number • Garment category (hoodie, t-shirt, woven jacket, etc.) • Target fabric and construction summary in two to three sentences • The sample type you are requesting (proto, fit sample, PP sample) • The size you want sampled (usually base size only for proto) • Your required delivery date for the sample • Any special instructions not covered in the tech pack
Do not write a long email. The tech pack contains the detail. The email provides context and confirms the sample request.
STEP 4: CONFIRM RECEIPT AND CLARIFY QUESTIONS
After submission, follow up within two business days to confirm the factory received your tech pack and has no questions. Most factories will review documentation and come back with questions — responding quickly keeps your timeline on track.
When the factory asks questions, update your tech pack with the answers as notes or revisions. This builds a more complete document over time and prevents the same question being asked in future rounds.
STEP 5: SET UP SAMPLE TRACKING
Once the factory confirms they are starting your sample, confirm the expected delivery date and set a reminder to follow up three to five days before that date if you have not received a shipping confirmation.
Track your sample status by style number. If you have multiple styles in sampling simultaneously, a simple spreadsheet with style number, sample round, date submitted, expected delivery date, and status prevents things falling through the cracks.
COMMON SUBMISSION MISTAKES TO AVOID
• Sending tech packs via WhatsApp photo: the resolution is compressed and measurements become unreadable. Always send PDF. • Sending different versions to different contacts at the factory: designate one point of contact for all tech pack communication. • Not version controlling: if you update your tech pack, increment the revision number and resend clearly labeled as the new version.
GARMENTIX SUBMISSION PROCESS
Garmentix accepts tech pack submissions via email with a structured intake form that confirms all required information is included. We confirm receipt within one business day and flag any documentation gaps before starting. Contact garmentix.net/contact to begin.
SUMMARY
Submit your tech pack as a single organized PDF with style number and revision clearly labeled. Write a short covering email confirming the sample type, size, and delivery requirement. Follow up within two days to confirm receipt and answer factory questions. Update your tech pack with the answers to build better documentation over time.
Related Articles
Garment Production Risk Management: Complete Guide for Fashion Brands
Learn how to implement effective garment production risk management across supplier selection, material quality, production monitoring, and logistics to protect your brand from costly failures.
ManufacturingHow to Differentiate Your Fashion Brand When Using ODM Manufacturing
Differentiation in ODM comes from fabric selection, colorways, branding investment, and collection curation. Here is the playbook.
ManufacturingODM Clothing Manufacturer for Startups: Finding the Right Partner
For startups, the right ODM manufacturer combines strong pattern libraries, low minimum orders, and responsive communication. Here is how to evaluate partners.
ManufacturingODM Private Label Clothing: How to Build a Brand on Factory Patterns
Private label brands built on ODM manufacturing can create strong identities through branding, fabric selection, and curation. Here is how to differentiate even when using shared base patterns.
ManufacturingODM Woven Apparel: What Factory Libraries Are Available for Woven Garments
ODM woven libraries are smaller than knitwear but cover shirts, casual trousers, and some outerwear. Here is what brands can realistically access in woven ODM production.
Manufacturing